Site Survey Checklist & Renovation Budget Estimation

CT-scan · X-ray · Angio installation readiness

FM-CSD-021(12) Saved locally
01

Project information

Survey identification and installation context

Survey type
02

Electrical system

Source, protection and equipment feed

UPS / AVR installation

Capacity, placement and ventilation ready

Transformer & supply capacity

Sufficient for equipment peak load

Cable & grounding

Correct size, route and earth connection

03

Air conditioning

Cooling capacity and operating condition

Cooling capacity

Meets the equipment heat-load requirement

Condition & redundancy

Stable, serviceable and suitable for operation

04

Radiation protection

Shielding envelope and safety controls

Lead glass
Lead door
Shielded walls / bunker
Warning lamp
05

Room condition

Dimensions, finishes and structural support

Floor reinforcement
Core drilling / wall opening
06

Routing & renovation access

Equipment delivery path from unloading point to room

Route is accessible
Door / wall demolition
Crane requirement
07

PACS, DR & utilities

Clinical network and room service readiness

PACS connection required
DR connection available
Oxygen
Medical air
Vacuum
AC outlets
08

Sketched site layout

Draw equipment, routes, cables, outlets and warning lamps

Insert symbol
Ready · 1 grid = 20 cm
Tap an object to select, then drag to move
How to draw: choose a tool, then drag from the start point to the end point. Smart angle: near 0° / 45° / 90° / 135° / 180° it locks straight; other angles remain free. Doors/windows: drag over a wall to cut an opening and align automatically. Dimension: drag from a wall, door edge or symbol; green points indicate Object Snap. Edit: select an object, drag to move, or drag a blue end handle to resize.
09

Renovation budget estimate

Preliminary estimate for planning only

Work itemQtyUnitUnit cost (THB)Amount (THB)
Subtotal฿0.00
Contingency %฿0.00
Estimated total฿0.00

Ready to issue the survey?

The report includes every field, the drawing and budget totals.

Site Survey Checklist · FM-CSD-021(12) · Effective 01/10/2024